Project Title |
Year |
Status |
Client |
Cost (RM) |
Feasibility Study On The Proposed New Bridge Over Kuala Kurau River, Kuala Kurau, Kerian District, Perak Darul Ridzuan. |
2001 |
Completed 2002 |
Public Works Department (JKR)/Khairi Consult |
N/A |
Report On Technical Assessment Of Drainage System Of Middle Ring Road II (MRRII), Kepong, Selangor. |
2005 |
Completed |
Bumi Highway / Khairi Consult |
N/A |
Report On Technical Assessment On Hydrological And Flood Risk For The Purpose Of Land Purchase In Section 8, Bukit Jelutong, Shah Alam, Selangor. |
2005 |
Completed |
Pos Malaysia Berhad/Khairi Consult |
11K |
Feasibility Study For Retrofitting Stormwater Quality Products Putrajaya, Malaysia |
2008 |
Completed |
Department of Irrigation and Drainage |
178K |
Analysis And Monitoring of DBKL 2 Building Using Fibre Optic Sensors. |
2009 |
Completed |
Photronix Technologies (M) Sdn Bhd / MIMOS |
N/A |
Proposed Installation of Flood Detection and Monitoring Device For Keretapi Tanah Melayu Berhad (KTMB) |
2012 |
Design Stage |
Keretapi Tanah Melayu Berhad (KTMB) / Photronix Technologies (M) Sdn. Bhd |
N/A |
Cadangan Menaiktaraf Dan Baikpulih Kolam Takungan Taman Jati, Nilai, Negeri Sembilan |
2012 |
Design Completed |
Department of Irrigation and Drainage Negeri Sembilan |
N/A |
Perkhidmatan Perunding Bagi Program Pembangunan Water Balance Bagi Pengurusan Sumber Air Negara (Fasa 2) – National Water Balance Management System (NAWABS) Bagi Lembangan Sg. Pahang & Sg. Kuantan |
2021 |
Ongoing |
Jabatan Pengairan dan Saliran Malaysia |
N/A |