Project Title | Year | Status | Client | Cost (RM) |
Proposed Mix Development on Lot 11099, Batu County, Duta Road, Kuala Lumpur | 2001 | Completed 2005 | Prime Minister Department/ Khairi Consult | 200M |
Drainage Design For Gebeng Bypass Highway, Kuantan District, Pahang | 2002 | Completed | Bumi Highway / Khairi Consult | 130M |
Flood Mitigation and Upgrading Works For Rasau River, Air Hitam River and Ancilary Drainage Works For Jalan Kebun Village, Lombong Village, Klang, Selangor | 2004 | Unsuccessful In Tender Bid | System Engineering / Khairi Consult | 27M |
Design of Drainage System for Kuala Lumpur Putrajaya Dedicated – Package 6 | 2005 | Completed | Maju Holdings | N/A |
Merab River Upgrading and Flood MitigationWorks | 2006 | Completed | Department of Irrigation and Drainage / Khairi Consult | 2.1M |
Emergency Repair and Upgrading Works For Merab River, Sepang, Selangor | 2006 | Completed | F-Class Consortium | 1.9M |
Flood Mitigation and River Upgrading Works For Merab River, Sepang, Selangor (Phase 2) |
2006 | Completed | Department of Irrigation and Drainage | 2.5M |
Flood Mitigation and Upgrading Works For Ramal River, Kajang, Selangor | 2007 | Completed | Sulaiman & Dayang Sdn. Bhd. | 8M |
Proposed Rehabilitation Works Along Jenderam River, Mukim Dengkil, Sepang, Selangor. | 2008 | Completed | Department of Irrigation and Drainage | 120K |
Hydraulic & Hydrology Assessment For Existing And Proposed Bridge Over Mulong River, In Conjuction with Road Upgrading Works, Pasir Hor County, Kubang Kerian District, Kelantan Subconsultancy & Perparation Of Bridge Hydrology And Hydraulic – Hec Ras Report | 2009 | Completed | Uritech Team Sdn Bhd / Khairi Consult Sdn. Bhd. | N/A |
Design of Sediment Basin & Trashrack at FACB Pond, Kajang, Hulu Langat District, Selangor. | 2009 | Completed | Department of Irrigation and Drainage | 754K |
Proposed Flood Prevention Works For Malaysian Agricultural Research & Development Institute (MARDI), and Jalan Kebun, Kelang, Selangor | 2009 | Completed | Malaysian Agricultural Research & Development Institute (MARDI) | 690K |
Projek Sistem Penuaian Air Hujan (SPAH) Di Bangunan Pasar Awam Mersing, Daerah Mersing, Johor | 2010 | Completed | Department of Irrigation and Drainage | 200K |
Design and Consultancy For Proposed New Factory, Plot 108, (Ptd 4069), Jalan Rumbia 4, Tanjung Langsat Industrial Complex, 81700 Pasir Gudang, Johor For Messrs Bahru Stainless Sdn Bhd. | 2011 | Under Construction | Bahru Stainless Sdn Bhd | 4.5M |
Erosion Sediment Control Plan (ESCP) : For River Diversion Component, Independent Deepwater Petroleum Terminal, Pengerang, Johor for Messrs Penta-Ocean (Malaysia) Sdn. Bhd. | 2012 | Under Construction | Penta-Ocean (Malaysia) Sdn. Bhd | N/A |
Kerja-kerja Kawalan Kuantiti Dan Kualiti Air Sungai / Sistem Saliran / Kolam Takungan Banjir Bagi Projek River of Life (ROL) Inisiatif 7 – Sg. Kerayong (Pakej 2) Untuk Tetuan Sitges Engineering Sdn Bhd | 2012 | Completed | Sitges Engineering Sdn. Bhd. | N/A |
Kerja-kerja Kawalan Kuantiti Dan Kualiti Air Sungai / Kolam Takungan Banjir Bagi Projek River of Life (ROL) Inisiatif – Kolam Takungan Banjir Benteng (Pakej 2) Untuk Tetuan Ultimate Builders Sdn Bhd | 2012 | Completed | Ultimate Builders Sdn. Bhd. | N/A |
Proposed Elmina East Development On Lots 360 & 364, Mukim Sg. Buloh And HSD 249288 (PT23043), Mukim Bukit Raja, Section U16, District of Petaling, Selangor For Messrs Pembinaan Tetap Teguh Sdn Bhd | 2012 | Under Construction | Pembinaan Tetap Teguh Sdn. Bhd. | N/A |
Projek Mass Rapid Transit (MRT) Lembah Kelang KVMRT Package V2 : Jajaran Taman Industri Sg. Buloh – Dataran Sunway Untuk Tetuan CSK Murni Services Sdn Bhd | 2012 | Under Construction | CSK Murni Services Sdn. Bhd. | N/A |
Projek Mass Rapid Transit (MRT) Lembah Kelang KVMRT Package V3 : Dataran Sunway – Section 17, Petaling Jaya, Selangor Untuk Tetuan Mudajaya Corporation Berhad | 2012 | Under Construction | Mudajaya Corporation Berhad | N/A |
Detailed EIA For The Proposed KPTC Malaysia Integrated Refinery And Petrochemical Development, Pengerang, Johor For Messrs Daya Eco Techno Sdn Bhd | 2012 | Completed | Daya Eco Techno Sdn Bhd | N/A |
Kerja-kerja Kawalan Kuantiti Dan Kualiti Air Sungai / Kolam Takungan Banjir Bagi Projek River of Life (ROL) Inisiatif 7 – Pakej 3 Untuk Tetuan Rapid Northern Builders Sdn Bhd | 2012 | Completed | Rapid Northern Builders Sdn Bhd | N/A |
Projek Cadangan Pembangunan Tapak Pelupusan Sisa Pepejal Sanitari di Temerloh, Pahang Untuk Tetuan Sumur Mutiara Sdn Bhd | 2012 | Under Construction | Sumur Mutiara Sdn Bhd | N/A |
Projek Mass Rapid Transit (MRT) Lembah Kelang ESCP For – KVMRT Package V8 : Taman Mesra – Kajang Station Untuk Tetuan Environmental Science (M) Sdn Bhd | 2012 | Under Construction | Environmental Science (M) Sdn Bhd | N/A |
Projek Mass Rapid Transit (MRT) Lembah Kelang ESCP For – KVMRT Package S7 : Balakong Station & Taman Koperasi Station Untuk Tetuan Environmental Science (M) Sdn Bhd | 2012 | Under Construction | Environmental Science (M) Sdn Bhd | N/A |
Projek Mass Rapid Transit (MRT) Lembah Kelang ESCP For – KVMRT Package S8 : Construction & Completion of Elevated Stations & Other Associated Works at Saujana Impian Station, Bandar Kajang Station & Kajang Station Untuk Tetuan Environmental Science (M) Sdn Bhd | 2012 | Under Construction | Environmental Science (M) Sdn Bhd | N/A |
Proposed Master Concept Plan at Bukit Lagong, Mukim Rawang, District of Gombak, Selangor for Messrs Sime Darby Property Berhad | 2013 | Master Concept Plan (MCP) | Sime Darby Property Berhad | N/A |
ESCP : Menaiktaraf Jalan B48 Dari Simpang 3 Jenderam ke Sepang Lama Fasa 2, Daerah Sepang, Selangor Untuk Tetuan Environmental Science (M) Sdn Bhd | 2013 | Under Construction | Environmental Science (M) Sdn Bhd | N/A |
ESCP : The Engineering, Procurement, Construction and Commissioning (EPCC) for the Flare Gas Recovery Unit (FGRU) at Gas Processing Plant Complex A, Paka, Daerah Dungun, Terengganu | 2013 | Under Construction | Toyo Engineering & Construction Sdn Bhd | N/A |
ESCP Report for Phase 2 of Site Clearing and Preparation for Project Refinery and Petrochemical Integrated Development (RAPID) in Pengerang, Johor | 2013 | Design Stage | Integrated Envirotech Sdn. Bhd | N/A |
ESCP : Design and Submission of ESCP under “Procurement, Construction and Commissioning (PCC) of Sipitang Lateral Gas Pipeline Project, Sabah | 2013 | Under Construction | TMM Engineering Services Sdn. Bhd | N/A |
ESCP : Cadangan Pembangunan Kediaman Kos Sederhana Skim ‘Rumah Pertamaku’ di atas Lot 40955 & Lot 40962, Alam Damai, Mukim Petaling, Daerah Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur | 2013 | Under Construction | Environmental Science (M) Sdn Bhd | N/A |
Cadangan Pembangunan Kediaman Di Atas Lot 3183, Lot 3184 (PT27429 & 27430) & Lot 3185, Mukim Rawang, Daerah Gombak, Selangor | 2014 | Under Construction | Peranan Serimas Sdn Bhd | N/A |
Detailed Study and Design for Improvement Works to Drainage System at KM385.500 to KM387.650 between Bank Negara and Kuala Lumpur Railway Station | 2014 | Under Construction | Keretapi Tanah Melayu Berhad (KTMB) | N/A |
Projek Pembinaan Kolam Takungan Banjir dan Kerja-kerja Berkaitan di Taman Mesra, Shah Alam, Daerah Petaling, Selangor Darul Ehsan | 2014 | Under Construction | Jabatan Pengairan dan Saliran | N/A |
Developing the Integrated Flood Forecasting and River Monitoring (iFFRM) with Decision Making Support System (DMSS) and Warning System for Muar River Basin | 2014 | Under Construction | Department of Irrigation and Drainage | N/A |
Projek Mass Rapid Transit (MRT) Lembah Kelang ESCP For – KVMRT Package MSPR8 : Construction and Completion of Multi Storey Car Park Building, External Works at Taman Koperasi Station | 2014 | Under Construction | Mendiraya Urus Services | 123 M |
ESCP : Kerja-kerja Pembinaan Semula Cerun di Laluan FT185 Seksyen 44.00 Jalan Simpang Pulai – Blue Valley, Perak Darul Ridzuan | 2014 | Completed | Merit Lead Sdn Bhd | 10.3 M |
ESCP Report for Engineering, Procurement, Construction and Commissioning of Temporary Common Camp Facilities and Infrastructure (Package 20A1) at Pengerang, Johor | 2014 | Under Construction | Environmental Science (M) Sdn Bhd | 687 M |
The Detailed Study and Design for Improvement Works to Drainage System at Utropolis – Hydraulic and Hydrology Study | 2015 | Under Construction | Paramount Property Development Sdn Bhd | 550K |
The Detailed Study and Design for Improvement Works to Drainage System at Stesen Janaelektrik Gelugor, Pulau Pinang | 2015 | Under Construction | Kumpulan IKRAM Sdn Bhd | 495 K |
Projek Menaiktaraf Anak Sungai Rawang Fasa 2, di Taman Garing Bagi Mengatasi Masalah Banjir serta Menaiktaraf Kolam Takungan Taman Garing dan Kerja-kerja Berkaitan, Mukim Rawang, Daerah Gombak, Selangor | 2015 | Design Stage | Jabatan Pengairan dan Saliran Negeri Selangor | 5 M |
Cadangan Membina Jalan Masuk Dari Lebuhraya DUKE ke Jalan 2/10, Taman Koperasi Polis Fasa 1, Kuala Lumpur |
2015 | Tender Stage | Dewan Bandaraya Kuala Lumpur (DBKL) | 3.2 M |
Cadangan Pembangunan Untuk Kota Elmina Di Atas Lot 1242 G.28045 (590.85 EKAR), Lot 1445 G.47272 (466.76 EKAR), Lot 1446 G.27703 (354.686 EKAR), Lot 1657 G.47071 (99.531 EKAR), Mukim Rawang, Daerah Gombak, Selangor Darul |
2015 | Planning Stage | Sime Darby Property Berhad | N/A |
Engineering, Procurement, Construction and Commissioning (EPCC) of The Design, Build and Commission 5.25MW Small Hydro Power Plant and All Other Associated Works at Sg. Kampar, Mukim Kinta, Perak | 2015 | Under Construction | Jurutera Perunding SB | N/A |
Engineering, Procurement, Construction and Commissioning (EPCC) of The Design, Build and Commission 6.00MW Small Hydro Power Plant and All Other Associated Works at Sg. Slim, Mukim Batang Padang, Perak | 2015 | Under Construction | Jurutera Perunding SB | N/A |
ESCP : Projek Rancangan Tebatan Banjir Bandar Pekan Fasa 2 – Pembinaan Levee Sg. Pahang, Pahang | 2015 | Under Construction | CSK Murni Services Sdn Bhd | 120 M |
EMP & ESCP for Rancangan Tebatan Banjir Pekan, Pekan Pahang Fasa II; Kerja-kerja Menaiktaraf Ban Selatan, Parit Utama, Sungai Air Hitam, Pembinaan Penyambung Ketapang, Struktur Kawalan Sungai Mat Dulang, Parit Kuliah, Sungai Air Tawar dan Kerja-kerja Berkaitan | 2015 | Under Construction | MMN Bina Sdn Bhd | 102.8 M |
Kerja-kerja Penyelenggaraan Struktur dan Kemudahan Tasik & Wetland Wilayah Persekutuan Putrajaya – RMS / WMS Professional Engineering Input | 2015 | Under Construction | Efektif Permai Sdn Bhd / PCE Engineering Services | N/A |
Proposed Mixed Commercial Development (20 Acres) Jalan Persiaran Cassia Barat 3, Batu Kawan, S.P.S, Pulang Pinang | 2015 | Under Construction | Paramount Property (PW) Sdn. Bhd. | N/A |
The Development of Integrated Flood Forecasting and River Monitoring (iFFRM) For Kedah/ Anak Bukit River Basin, Kedah Darul Aman | 2015 | Completed | Jabatan Pengairan dan Saliran Malaysia (JPS) | 1.7 M |
Projek Mempertingkatkan Sistem Perparitan di Pekan Kepong, Kuala Lumpur | 2016 | Completed | Dewan Bandaraya Kuala Lumpur (DBKL) | 2.1 M |
Menaiktaraf Sistem Saliran di Kg. Sungai Merab, Mukim Dengkil, Daerah Sepang, Selangor | 2016 | Completed | Jabatan Pengairan dan Saliran Malaysia (JPS) | 5 M |
Projek Mass Rapid Transit Lembah Kelang Line 2 (SSP) Design and Submission of Drainage & Erosion Sediment Control Plan for “Package V209” : Construction and Completion of Viaduct Guideway and Other Associated Works from Persiaran Alpinia to Persiaran Apec | 2016 | Completed | Khairi Consult Sdn Bhd / Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) | 715 M |
Proposed Development of Langat 2 Water Treatment Plant and Water Reticulation System in Selangor Darul Ehsan Pakej 7 – Membina dan Menyiapkan Kolam Air Imbangan Hulu Langat Berkapasiti 92 Juta Liter | 2016 | Completed | Environmental Science (M) Sdn Bhd | 8.65 B |
Projek Mass Rapid Transit Lembah Kelang Line 2: Design and Updating of Erosion Sediment Control Plan for Sg. Buloh Depot Extension – Stabling Yard | 2016 | Completed | Environmental Science (M) Sdn Bhd / Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) | N/A |
Projek Mass Rapid Transit Lembah Kelang Line 2 (SSP) Package V207: Construction And Completion Of Viaduct Guideway And Other Associated Works From UPM To Taman Pinggiran Putra | 2017 | Completed | Environmental Science (M) Sdn Bhd / Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) | 588 M |
Preparation of Erosion and Sediment Control Plan Report (ESCP) – Dry Dock 3 (DD3) Project for Malaysia Marine and Heavy Engineering Yard Optimization at Pasir Gudang, Johor Darul Takzim | 2017 | Completed | Environment Asia Sdn Bhd | 500 M |
Projek Mass Rapid Transit Lembah Kelang Line 2 (SSP) Package V206: Construction And Completion Of Viaduct Guideway And Other Associated Works From Serdang Raya To UPM | 2017 | Completed | Environmental Science (M) Sdn Bhd / Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) | 952 M |
Projek Mass Rapid Transit Lembah Kelang Line 2 (SSP) Package V209: Construction And Completion Of Viaduct Guideway And Other Associated Works From Persiaran Alpinia To Persiaran Apec | 2017 | Completed | Environmental Science (M) Sdn Bhd / Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) | 715 M |
Engineering, Procurement, Construction and Commissioning of the East Coast Rail Link Project for Package B (State of Pahang) | 2017 | Completed | China Communications Construction Company (M) Sdn. Bhd. (CCCC)/ Europasia Engineering Services Sdn Bhd | 55 B |
Construction and Completion of Light Rail Transit Line 3 (LRT3) From Bandar Utama To Johan Setia Package GS10 – Construction and Completion of Guideway, Stations, Park and Rides, Ancillary Buildings, and Associated Works | 2017 | Completed | Prasarana Malaysia Berhad / Environmental Science (M) Sdn Bhd | N/A |
Rekabentuk Terperinci Bagi Projek Menaiktaraf Sistem Saliran di Teluk Menegun Fasa 2, Daerah Klang, Selangor | 2017 | Completed | Jabatan Pengairan dan Saliran Negeri Selangor | N/A |
Projek Mass Rapid Transit Lembah Kelang Line 2 (SSP) Updating Of Erosion Sediment Control Plan (ESCP) Under Package S209: Construction And Completion Of Elevated Stations And Other Associated Works at 16 Sierra Station & Cyberjaya North Station | 2018 | Completed | Environmental Science (M) Sdn Bhd | 137 M |
Projek Mass Rapid Transit Lembah Kelang Line 2 (SSP) Updating Of Erosion Sediment Control Plan (ESCP) Under Package S210: Construction And Completion Of Elevated Stations And Other Associated Works at Cyberjaya City Centre and Putrajaya Sentral | 2018 | Completed | Environmental Science (M) Sdn Bhd | 145 M |
Design and Submission of Erosion and Sediment Control Plan (ESCP) at Malaysia Marine and Heavy Engineering Sdn. Bhd. Dry Dock 3 | 2018 | Completed | CHEC Construction (M) Sdn Bhd | N/A |
Pembangunan Modul ‘Land Disturbing Pollution Prevention and Mitigation Measures (LDP2M2) – Designer Training Program’ | 2018 | Completed | Institut Alam Sekitar Malaysia (EiMAS), Jabatan Alam Sekitar | 349 K |
Kajian Kepenggunaan Jeti Komersial dan Mod Pengangkutan di Sungai Langat dan Sungai Klang untuk Cadangan Kajian Pengurusan Jeti Negeri Selangor | 2018 | Completed | Lembaga Urus Air Selangor (LUAS) / MAB Environmental Consultants Sdn Bhd | N/A |
Hydraulic & Hydrology Assessment Study & Report for Hulu Langat Casting Yard SBG Storage | 2018 | Completed | Acre Works Sdn Bhd | N/A |
Design & Submission of Erosion and Sediment Control Plan (ESCP) for Temporary Access Road to th PDT3 Reclamation Area, Pengerang, Deepwater Terminal for Phase 3, Pengerang, Johor | 2018 | Completed | Penta-Ocean Construction Co. Ltd. | N/A |
Design & Submission of Erosion and Sediment Control Plan (ESCP) for Temporary Drain No. 1 to the PDT3 Reclamation Area, Pengerang, Deepwater Terminal for Phase 3, Pengerang, Johor | 2018 | Completed | Penta-Ocean Construction Co. Ltd. | N/A |
Cadangan Kerja-Kerja Mengatasi Masalah Banjir Kilat Di Jalan 16/38D, Taman Sri Sinar, Segambut, Wilayah Persekutuan Kuala Lumpur | 2019 | Completed | Dewan Bandaraya Kuala Lumpur (DBKL) | N/A |
Cadangan Kerja-kerja Pembaikan Cerun dan Kerja-Kerja Berkaitan di Jalan AU2C/9, Taman Desa Keramat, Kuala Lumpur | 2019 | Completed | Dewan Bandaraya Kuala Lumpur (DBKL) | N/A |
Cadangan Kerja-Kerja Mengatasi Masalah Banjir Kilat di Jalan Selinsing 7, Taman City, Segambut, Wilayah Persekutuan Kuala Lumpur | 2019 | Completed | Dewan Bandaraya Kuala Lumpur (DBKL) | N/A |
Cadangan Kerja-Kerja Baikpulih ‘Expansion Joint’ di Jalan Sekitar Kuala Lumpur | 2019 | Completed | Dewan Bandaraya Kuala Lumpur (DBKL) | N/A |
Cadangan Membina Penutup Konkrit Di Atas Longkang Sedia Ada Di Surau Al-Falah, Jalan Danau Saujana, Danau Kota, Kuala Lumpur | 2019 | Completed | Dewan Bandaraya Kuala Lumpur (DBKL) | N/A |
Cadangan Kerja-Kerja Pembinaan Tempat Letak Kereta, Laluan Pejalan Kaki, Tangga ke Stesen LRT Sri Rampai dan Kerja-Kerja Berkaitan di Jalan Mohd Yatim Yahaya (Missing Link), Setiawangsa, Kuala Lumpur | 2019 | Completed | Dewan Bandaraya Kuala Lumpur (DBKL) | N/A |
Preparation of Land-Disturbing Pollution Prevention and Mitigation Measures (LP-P2M2) and Erosion Sediment Control Plan (ESCP) for Development of Proposed Transmission Line 500kV Double Circuit Overhead Line from Alor Gajah-Bahau South (Tampin Forest Reserve) | 2019 | Completed | TNB Research Sdn. Bhd. | N/A |
Perkhidmatan Menyediakan Pelan Projek Jambatan Kampung Sungai Chinchin, Mukim Setapak, Daerah Gombak, Selangor Darul Ehsan | 2019 | Completed | Jabatan Pengairan dan Saliran Daerah Gombak | N/A |
Preparation of Erosion Sediment Control Plan (ESCP) for Development of Proposed Transmission Line 275/132kV Kg. Pandan to Ampang East (AP24/2-AP31) | 2019 | Completed | TNB Research Sdn. Bhd. | N/A |
Cadangan Menaiktaraf Sistem Terusan Sekunder di Taman Sekinchan 2, Kawasan Sekinchan, Daerah Sabak Bernam, Selangor Darul Ehsan | 2020 | Completed | Jabatan Pengairan dan Saliran Negeri Selangor | N/A |
Rekabentuk Terperinci Kolam Takungan dan Kerja Berkaitan di Lebuhraya Shapadu Bersebelahan Taman Mutiara Bukit Raja, Daerah Klang, Selangor Darul Ehsan. | 2020 | Completed | Jabatan Pengairan dan Saliran Negeri Selangor | N/A |
LRT3-GS01 – Hydrology and Hydraulic Study for Sg. Kayu Ara | 2021 | Completed | Mudajaya Corporation Berhad | N/A |
Cadangan Pembangunan Bercampur (Perniagaan dan Industri) Mengikut Seksyen 21, Akta 172 Serta Melalui Serah Balik Secara Keseluruhan dan Pemberi Milikan Semula Tanah di bawah Seksyen 197 dan 76, Kanun Tanah Negara di Atas Lot 85988, Lot 85990, Lot 88562 & Lot 88563 (Lot Lama 1446), Lot 88564 & Lot 88565 (Lot Lama 1455), Lot 1657, Lot 1505 Dan Sebahagian Tanah Kerajaan (Rizab Jalan) Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan. | 2021 | Completed | Khairi Consult Sdn Bhd | N/A |
The Detailed Design and Supervision for Phase 1 for the Development of Kedah Science Technology Park (KSTP) at Mukim Sungai Laka, Kubang Pasu District, Kedah Darul Aman for the Northern Corridor Implementation Authority (NCIA) | 2021 | Completed | Khairi Consult Sdn Bhd | N/A |
Stormwater / Drainage / Hydrology/ Hydraulics/ Erosion Sediment Control Plan‘s Gallery Photos